Step 1 |
|
We have the T-bar clamp (TBC) to use it in conjunction with ceiling mount cartridge(CC) to clamp onto the metal grid of T-bar. On location where there has no metal grid, a metal cross tee or spline needs to be provided. |
Step 2 |
|
This T-bar clamp will not damage the metal grid, is removable and reusable. Once TBC+CC are in location, simply snap the track into the ceiling mount cartridges one after another. |
Step 3 |
|
Number of required mounting TBC+CC is : Every 9″ a piece for coiled F-track , straight Application. Every 12″ a piece for coiled F-track ,curved Application. Every 18″ a piece for straight F-track. Every 36″ a piece for aluminum straight track. |